Mumbai Metro: Timings, Routes, Maps, Stations, and Fares

Mumbai Metro: Timings, Routes, Maps, Stations, and Fares

Mumbai’s rapidly expanding metro network has transformed urban transportation since its inception in 2006. This comprehensive guide explores the Mumbai Metro: Timings, Routes, Maps, Stations, and Fares for all existing and planned lines.

Network Overview

Line NumberColor CodeRouteStatusLengthKey Features
Line 1Blue LineVersova – Andheri – GhatkoparOperational11.4 kmFirst operational line
Line 2AYellow LineDahisar (E) to DN NagarOperational18.6 kmConnected with Line 7
Line 2BYellow LineDN Nagar to MandaleUnder construction22.6 kmCost: ₹11,000 crore
Line 3Aqua LineCuffe Parade-BKC-SEEPZ-AareyPartially Operational33.5 kmUnderground line
Line 4Green LineWadala to KasarawadavaliUnder construction32.32 kmCost: ₹15,000 crore
Line 5Orange LineThane – Bhiwandi – KalyanUnder construction24.9 kmCost: ₹8,417 crore
Line 6Pink LineSwami Samarth Nagar – VikhroliUnder construction15.31 kmWest-East connector
Line 7Red LineDahisar (E) – Andheri (E)Operational33.5 kmPhase 1 & 2 complete
Line 7ARed LineAndheri (E) – CSI AirportUnder constructionAirport connectivity
Line 8Gold LineCSIA – NMIAProposed35 kmAirport connector
Line 9Red LineDahisar (E) – Mira BhayanderUnder construction10.58 kmExtension of Line 7
Line 10Green LineGaimukh – Shivaji ChowkApproved9.2 kmCost: ₹4,476 crore
Line 11Green LineWadala – CSMTProposedLine 4 extension
Line 12Orange LineKalyan to TalojaProposed22.17 km19 stations planned
Line 13Purple LineShivaji Chowk – VirarProposed23 kmCost: ₹6,900 crore
Line 14Magenta LineKanjurmarg to BadlapurProposed37.9 km15 stations planned

Detailed Analysis of Each Line

Line 1 (Blue Line)

Stations:

Station NameInterchange
VersovaTerminal
DN NagarLine 2A
Azad Nagar
AndheriWestern Railway
Western Express Highway
Chakala
Airport Road
Marol NakaLine 3
Saki Naka
Asalpha
Jagruti Nagar
GhatkoparCentral Railway

Key Features:

  • First operational metro line
  • Speed: 80 km/hr
  • Fully elevated
  • Daily ridership: 450,000+
  • Operating hours: 6 AM – 10 PM
Mumbai Metro: Timings, Routes, Maps, Stations, and Fares

Line 2A (Yellow Line)

Stations:

Station NameKey Features
DahisarTerminal
Anand Nagar
Kandarpada
IC Colony
Eksar
Borivali WestRailway connection
Shimpoli
Kandivali West
Dhanukarwadi
Valnai
Malad WestCommercial hub
Lower Malad
Bangur Nagar
GoregaonRailway interchange
Lower Oshiwara
Oshiwara
DN NagarLine 1 interchange
Mumbai Metro: Timings, Routes, Maps, Stations, and Fares

Line 2B

Stations:

Station NameFeatures
DN NagarLine 2A interchange
ESIC Nagar
Prem Nagar
Indira Nagar
Nanavati HospitalMedical facility
Khira Nagar
Saraswat Nagar
Bandra MetroRailway connection
BKCBusiness district
MTNL
Kurla EastRailway interchange
Chembur
Diamond Garden
Shivaji Chowk
BSNL
MankhurdRailway connection
MandalaTerminal

Line 3 (Aqua Line)

Operational Stations (Phase 1):

Station NameFeatures
Aarey JVLRTerminal
SEEPZIT hub
MIDCIndustrial area
Marol NakaLine 1 interchange
CSIA T1Airport Terminal 1
Sahar Road
CSIA T2Airport Terminal 2
BKCBusiness district

Future Stations (Phase 2):

Station NameFeatures
Cuffe ParadeTerminal
Badhwar Park
Vidhan BhawanGovernment offices
ChurchgateRailway terminus
Hutatma ChowkHeritage area
CST MetroUNESCO site
KalbadeviShopping district
Girgaon
Mumbai CentralRailway terminus

Line 4 (Green Line)

Planned Stations:

Station NameFeatures
WadalaTerminal
Bhakti Park
Anik Nagar
Suman Nagar
Siddarth Colony
Garodia Nagar
Pant Nagar
VikhroliRailway connection
Bhandup
Mulund
Teen Hath Naka
Kapurbawdi
KasarvadavaliTerminal
Mumbai Metro: Timings, Routes, Maps, Stations, and Fares

Line 5 (Orange Line)

Stations:

Station NameFeatures
KapurbawdiTerminal
Balkumbh Naka
KasheliCreek bridge
Kalher
Purna
Anjur Phata
Dhamankar NakaUnderground section
Bhiwandi
Gopal Nagar
Temghar
Rajnouli
Gove Gaon MIDCIndustrial area
Kon Gaon
Durgadi FortHeritage site
Sahajanand Chowk
Kalyan stationRailway interchange
Kalyan APMCTerminal

Line 6 (Pink Line)

Stations:

Station NameFeatures
Swami Samarth NagarTerminal
Adarsh NagarLine 2A interchange
Momin Nagar
JVLRLine 7 interchange
Shyam Nagar
Mahakali CavesTourist spot
SEEPZ villageLine 3 interchange
Saki Vihar Road
Ram Baug
Powai LakeTourist attraction
IIT PowaiEducational hub
Kanjurmarg westLine 4 interchange
VikhroliTerminal

Key Features:

  • Length: 15.31 km
  • Combined 2.58 km road flyover below metro line
  • Second west-east corridor
  • Multiple interchange points with other lines

Line 7 (Red Line)

Stations:

Station NameFeatures
Dahisar EastTerminal
Shrinath Nagar
Borivali OmkareshwarReligious site
Magathane Bus DepotTransport hub
Thakur ComplexResidential area
Mahindra & MahindraIndustrial zone
Bandongri
Kurar Village
Vitt Bhatti Junction
Aarey Road Junction
V Nagar
Hub MallShopping center
Mahanand
JVLR JunctionLine 6 interchange
Shankarwadi
Andheri eastRailway connection

Key Features:

  • Length: 33.5 km
  • Fully operational
  • Connected to international airport
  • Phase 1 & 2 completed

Line 7A (Red Line Extension)

Stations:

Station NameFeatures
Andheri EastLine 7 interchange
International AirportTerminal 2 connection

Key Features:

  • Direct airport connectivity
  • Extension of Line 7
  • Under construction

Line 8 (Gold Line)

Planned Route:

  • CSMIA (Mumbai International Airport)
  • Navi Mumbai International Airport (NMIA)

Key Features:

  • Length: 35 km
  • Estimated cost: ₹15,000 crore
  • Expected daily ridership: 9 lakh passengers
  • First mass transit connection between Mumbai and Navi Mumbai airports

Line 9 (Red Line Extension)

Stations:

Station NameFeatures
Dahisar eastLine 7 interchange
Pandhurang Wadi
Amar Palace
Zankar Company
Sai Baba Nagar
Deepak HospitalMedical facility
Shahid Bhagat Singh Garden
Subhash Chandra Bose Station
MurdhaNew extension
Rai GaonTerminal

Key Features:

  • Length: 10.58 km
  • Cost: ₹3,600 crore
  • Phase 1 completion: 2024 end
  • Extension till Dongri depot planned

Line 10 (Green Line)

Stations:

Station NameFeatures
Gaimukh Reti BundarTerminal
Varsova Char Phata
Kashimira
Shivaji ChowkLine 9 interchange

Key Features:

  • Length: 9.2 km
  • Cost: ₹4,476 crore
  • Double-decker design planned
  • Expected completion: 2027

Line 11 (Green Line)

Planned Route:

  • Extension of Line 4
  • Wadala to CSMT connection

Key Features:

  • Provides direct connection to CSMT
  • Integration with Central Railway
  • Proposed extension

Line 12 (Orange Line)

Stations:

Station NameLocation
APMC KalyanTerminal
Ganesh Nagar
Pisawali Gaon
Golvali
Dombivli MIDCIndustrial area
Sa Gaon
Sonar Pada
Manpada
Hadutane
Kole Gaon
Nilje Gaon
Wadavali
Bale
Vaklan
Turbhe
Pisawe DepotMaintenance facility
Pisawe
TalojaTerminal

Key Features:

  • Length: 22.17 km
  • 19 elevated stations
  • Foundation stone laid March 2024
  • Extension of Line 5

Line 13 (Purple Line)

Route Details:

  • Connects Mira Road to Virar
  • Length: 23 km
  • Estimated cost: ₹6,900 crore
  • Expected completion: 2026

Key Features:

  • DPR under preparation
  • Will serve northern suburbs
  • Integration with Western Railway

Line 14 (Magenta Line)

Route Coverage:

  • Kanjurmarg to Badlapur
  • Length: 37.9 km
  • 15 stations planned

Station Types:

  • 13 elevated stations
  • 1 underground station
  • 1 at-grade station

Key Interchanges:

  • Metro 4 connection
  • Metro 6 connection
  • Kanjurmarg Railway Station

Coverage Areas:

  • Badlapur
  • Ambernath
  • Nilje
  • Shil Phata
  • Mahape
  • Ghansoli
  • Thane Creek
  • Kanjurmarg

Mumbai Metro: Timings, Routes, Maps, Stations, and Fares – Operating Information

Timings:

  • Operating Hours: 6:00 AM to 10:00 PM
  • Peak Hour Frequency: Every 4-5 minutes
  • Off-Peak Frequency: Every 7-8 minutes

Fare Structure:

Distance (km)Fare (₹)
0-310
3-1220
12-1830
18-2440
24-3050

Ticketing Options:

  1. Smart Cards
  • Minimum recharge: ₹100
  • Security deposit: ₹50
  • 5% discount on travel
  1. Single Journey Tokens
  • Valid for 75 minutes
  • Must enter within 20 minutes
  1. Mobile QR Tickets
  • Available through official app
  • Contactless entry/exit
  1. What are the operating hours of the Mumbai Metro?

    The Mumbai Metro operates daily from 6:00 AM to 10:00 PM.

  2. How frequently do Mumbai Metro trains run?

    Trains run every 4-5 minutes during peak hours and every 7-8 minutes during off-peak hours, with reduced frequency early morning and late evening.

  3. Can I use a smart card for Mumbai Metro travel?

    Yes, smart cards are available with a minimum recharge of ₹100 and a security deposit of ₹50.

  4. Which Mumbai Metro lines are currently operational?

    Currently, four lines are operational: Line 1 (Blue Line), Line 2A (Yellow Line), Line 3 (Aqua Line – partial), and Line 7 (Red Line).

  5. How much does it cost to travel on the Mumbai Metro?

    Fares range from ₹10 to ₹50 based on distance traveled, with the minimum fare being ₹10 for 0-3 km and maximum being ₹50 for 24-30 km.

Conclusion

The Mumbai Metro network represents a revolutionary transformation in Mumbai’s public transportation system. With 16 lines at various stages of development, it promises to connect every corner of the city and its suburbs. The ongoing expansion will significantly reduce travel time and provide comfortable, air-conditioned travel options for millions of commuters.

We’d love to hear about your experiences using the Mumbai Metro system. Have you tried any of the new lines? What improvements would you like to see in the service? Share your thoughts and suggestions in the comments below!

(Visited 35 times, 1 visits today)